Sign in with your email
Power Usage Effectiveness — measure data center energy efficiency
Project Information
PUE Calculation
| Equipment | Category | Qty | Power/Unit | Total (kW) | UPS Backed | IT Related | |
|---|---|---|---|---|---|---|---|
| No equipment added yet. Use the form above to add items. | |||||||
Data Hall IT Power
| Data Hall | Qty | IT Power / Hall (MW) | Total IT Power (MW) | UPS | |
|---|---|---|---|---|---|
| No data halls added yet. | |||||
| Total IT Power | 0.00 MW | ||||
Daily Loading Trend
Enter IT load as % of rated capacity for each hour. Default 100%.
ERA5 reanalysis, 20-year peak per hour slot (8 760 hrs) · Wet bulb via Stull (2011) · Aligned with ASHRAE TMY methodology
N=20 Year Extreme Design Conditions (peak of 20-year dataset)
Duration curve: hours ranked hottest → coldest. DB = dry bulb · WB = wet bulb.
| Model | Type | Qty | Capacity (kW) | COP | Load (%) | Power (kW) | UPS | IT Related | COP Table | Range / Config | |
|---|---|---|---|---|---|---|---|---|---|---|---|
| No chillers added yet. | |||||||||||
| Model | Qty | Cells/Unit | Fan kW/Cell | Pump kW/Unit | Total (kW) | UPS | IT Related | Performance | ||
|---|---|---|---|---|---|---|---|---|---|---|
| No cooling towers added yet. | ||||||||||
Free Cooling
Pair each chiller with a free cooling mode and a cooling tower.
Electrical Loss
Set global loss percentages, then tick which equipment items are affected. Losses are applied during PUE computation.
Ticked items will have the selected losses added to the facility power during PUE calculation.
Select PUE Calculations to Run